Olefins Cracker Enlargement for Repsol-YPF
Optimum Production Capacity
Tarragona, Spain
Opening: February 2009
Revamping Olefins plant to obtain a 7% increase in the production. Including:
- Modification of the existing equipment.
- New equipment adjustments.
- New instrumentation and modification for existing equipment.
- Electric Sub-station expansion.
- Safety PLC expansion and migration.
- Review of fire protection system.
Scope:
- Detailed Engineering (65.000 h).
- Purchasing Management (equipment and materials).
- Site Supervision.
